Home of
"The PB&J"

  








© Jamie Foster, 2005-present

May 30, 2005

Construction of the fence continues...


Lynn works the "garden wire" (not hog wire; 16 gauge welded steel wire with 2" high 3" wide rectangles). The view is up the driveway along the west side of the lot to Camino Caballo. The tracks will go from the orange flag to just left of the post behind Lynn, continue along the sidewalk, then curve gently right behind the vehicle and on toward the front (northside) of the lot.

  
Trevor instals some gate hardware right outside Jamie and Lynn's bedroom window, while Synergy stands guard. Synergy, of course, is the immediate beneficiary of the new fence.


Tracy (standing) and Lynn continue with the garden wire.

  
Jon (left) and Matt build one of the gates. Between the lone post in the distance and the right edge of the trellis will be a gate. The train tracks will run roughly from where Jon and Matt are to that gate, then along the left side of a future carbarn to the right of the post, then curve around the far side of the east house crossing that house's driveway. The picture below is exactly the opposite view.


This view (exactly opposite the view directly above) looks from Jamie and Lynn's backyard across to Tracy and Matt's house. The orange flags mark the 7.5" railroad path, which will continue generally to where Jon and Matt are (roughly in the middle of the picture). At that point it will switch left to go around the leftside of the far house, or switch right and go through the gate between the houses.

Back to May 28 | On to June 4

| G-scale | 7.5" Gauge | Home | News | Links | Gift Shop | About |