|
[Home]
[Synopsis]
[Train Layout (HO)]
[Schedule: 2002, 2003]
[For Teachers]
[What's New]
[Site Overview]Alvin All-Star Railroad (AASRR)Logo Design and Patch |
In September of 2001, the class was asked to draw their ideas for a class project railroad patch. The selected design was "cleaned up" a bit and patches were produced. The original artwork is pictured at left, and the final patches are pictured at right.
