September 14, 2003
Run Day




There must be big game off to the left as this train exits the tunnel and heads out across the trestle.


The Pacific Coast Railway (PCRy) No. 2 exits the tunnel.


Passengers at the depot board PCRy No. 2.


The Southern Pacific's X-1 exits this tunnel on its way to the next tunnel followed by the trestle bridge.


The X-1 hauls past the car barn. Note how open this pine-covered area feels given that it was pruned yesterday.






These D&RGW gondolas loaded with excursion passengers pass under the signal bridge as they approach the depot.


A Goleta Valley locomotive rounds the turn as it swings toward the depot. This section now has steel rails.


Union Pacific No. 1943 approaches the depot.


The Goleta Valley steamer glides over the new steel-railed switch installed yesterday.








| What's New | HO Layout | Schedule of Events | Home | Stories | Memorials | Links | About | Facebook |

This site was last updated on April 18, 2024 - What's New
Copyright © 2003-Present. Over 20 years!
All rights are reserved as to text and images on this web site either by the BCWRR or the writer/creator of the material.
The rolling stock images used/modified at the top for navigation are from Dan's Depot.