|
[Home]
[Synopsis]
[Train Layout (HO)]
[Schedule: 2002, 2003]
[For Teachers]
[What's New]
[Site Overview]
Alvin All-Star Railroad (AASRR)5/2/03
|
Above, the painting of the lime tower for the sugar mill is completed while in the background work on the divider continues.
At right, work on the divider buildings continues.
At left, the railroad clerk (in the clerk's hat and red sweatshirt) gives a train order to the signalman (yellow shirt). The engineer (white shirt) is paying close attention trying to anticipate the hand signals he's about to receive.
At left, a different camera angle catches the same clerk as he hands over the day's orders. Note the wall-mounted oil lamp on the desk in front of him and the switch lock in the foreground.
Next